Energy infrastructure chokepoint P0 Egypt / Red Sea
SUMED Pipeline
Attribution : eia_suez_sumed_critical_routes_2019 · eia_world_oil_transit_chokepoints · suez_canal_authority_navigation_statistics · unctad_red_sea_panama_disruptions_2024 · unctad_review_maritime_transport_2024
Flux
- Crude oil · importance 4 Design capacity moved to the reference metric sumed_design_capacity (ADR 0069). It was sitting in estimated_volume, where engine_flow_value multiplied it by the crude price and reported a MAXIMUM as if it were realised throughput. No realised throughput is published for SUMED, so the flow carries no volume (omit, never fabricate).
Métriques de référence
Une métrique n'est pas un flux : un stock est un solde à une date, une capacité un maximum potentiel. Ni l'un ni l'autre ne se compare à un volume réellement écoulé.
- SUMED pipeline design capacity · Capacity 2.5 million_barrels_per_day · 2026A maximum potential rate, not a realised flow. EIA identifies SUMED capacity at 2.5 million b/d.
Risques
- Capacity constraint · Structural · Assessed · impact 4
- Political instability · Baseline · Monitoring · impact 4
- Sabotage · Baseline · Monitoring · impact 5
Données canoniques issues de la base chokepoints (lecture seule). Geometry is schematic and not validated for navigational or legal precision.
Les résultats analytiques dérivés sont des candidats en attente de validation humaine et ne
constituent ni une prédiction ni un conseil engageant.