Energy infrastructure chokepoint P0 Egypt / Red Sea

SUMED Pipeline

Attribution : eia_suez_sumed_critical_routes_2019 · eia_world_oil_transit_chokepoints · suez_canal_authority_navigation_statistics · unctad_red_sea_panama_disruptions_2024 · unctad_review_maritime_transport_2024

Flux
  • Crude oil · importance 4
    Design capacity moved to the reference metric sumed_design_capacity (ADR 0069). It was sitting in estimated_volume, where engine_flow_value multiplied it by the crude price and reported a MAXIMUM as if it were realised throughput. No realised throughput is published for SUMED, so the flow carries no volume (omit, never fabricate).
Métriques de référence

Une métrique n'est pas un flux : un stock est un solde à une date, une capacité un maximum potentiel. Ni l'un ni l'autre ne se compare à un volume réellement écoulé.

  • SUMED pipeline design capacity · Capacity
    2.5 million_barrels_per_day · 2026
    A maximum potential rate, not a realised flow. EIA identifies SUMED capacity at 2.5 million b/d.
Risques
  • Capacity constraint · Structural · Assessed · impact 4
  • Political instability · Baseline · Monitoring · impact 4
  • Sabotage · Baseline · Monitoring · impact 5